Drinking Fountains

The two drinking fountains that have been in storage since the winter are closer to their new home on the Jane Barnes Field thanks to two of our volunteers.  Jim Holmes brought out his backhoe to excavate the footings and drain sumps.  He then filled them with rock and backfilled with soil.

Dave Lawrie put his concrete skills to work building forms and pouring the concrete.

Dennis Rollins has handled the rough plumbing work.

The concrete was donated (as in the past) by Rick Thorn of Clear Lake Redimix.

It will be early July before the installation is complete since the installer will be out of town until then.

This entry was posted in Uncategorized. Bookmark the permalink.