Monthly Archives: September 2016

Site Prep Begins

RB Peters is doing site prep on the area at the south end of the Jane Barnes Field.  The work will create the proper slope and elevations per the engineer’s plans.  This area will be developed with a bike pump track, skate … Continue reading

Posted in Uncategorized | Leave a comment