Site Prep Begins

RB Peters is doing site prep on the area at the south end of the Jane Barnes Field.  The work will create the proper slope and elevations per the engineer’s plans.  This area will be developed with a bike pump track, skate area and sand courts.img_6015

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *