Power Pole Installed

PG&E crew setting power pole.

Thanks to PG&E our power pole is in place and connected.  Mark McCrea, a Troubleman with PG&E arranged for a crew to set the pole.  When they finished Mark made the tie in electrical connections.  Next up is 510 feet of trenching and installation of conduit and wire to connect the irrigation timers to the pole.

This entry was posted in Development News. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *